Return to Goodall Library Home Page

Photo Gallery

GOODALL LIBRARY, SANFORD MAINE


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favorites Search
Home > 2024-25 Renovation

1. Before the Move


IMG_0089.JPG

Here's how the library looked the day before we closed in September 2023 at the start of our renovation project.

72 files, last one added on Nov 26, 2024
Album viewed 79 times

2. Move to Shaw's Plaza


2C6B7B5D-FDD1-4DE7-8165-8B42EDE1D197.JPG

We moved to 1364 Main Street in September 2023 for the duration of our renovation project. We're at Shaw's Plaza in the former Aaron's Appliance Store next to Planet Fitness.

50 files, last one added on Nov 26, 2024
Album viewed 29 times

3. Construction 2023-24


IMG_3632.JPG

The first fifteen months of the project, showing iInterior demolition, infrastructure improvements, and framing the new floor plan. General Contractor: TPD Construction (Sanford). Architects: Barbā+Wheelock (Portland)

107 files, last one added on Nov 26, 2024
Album viewed 104 times

4. Construction 2025


IMG_20250121_095444.jpg

Pictures of interior spaces as they near completion.

47 files, last one added on Mar 19, 2025
Album viewed 167 times

4 albums on 1 page(s)

Top rated - 2024-25 Renovation
IMG_20250121_095444.jpg
Circ Desk197 views55555
(2 votes)
IMG_20250304_111847.jpg
March 4 central hall26 views55555
(1 votes)
IMG_20250304_111823.jpg
March 4 meeting room26 views55555
(1 votes)
IMG_20250304_111801.jpg
March 4 1st floor office26 views55555
(1 votes)

Last additions - 2024-25 Renovation
IMG_20250319_083655.jpg
March 19 - 2nd floor22 viewsMar 19, 2025
IMG_20250319_083450.jpg
March 19 - Public computer workstations11 viewsMar 19, 2025
IMG_20250319_083443.jpg
March 19 - 2nd floor restroom doors13 viewsMar 19, 2025
IMG_20250319_083428.jpg
March 19 - Built in reference bookcase11 viewsMar 19, 2025

Random files - 2024-25 Renovation
IMG_0125.JPG
12 views
IMG_1812.JPG
17 views
IMG_0088.JPG
13 views
IMG_3901.JPG
13 views

Return to Goodall Library Home Page